Skip to Content
You may also like this products
My Cart

Faster welding of large orders at a metal furniture manufacturer

11 December 2024 by
Marketing

Metal products · Home and garden furniture · Collaborative welding

One welder, one shift and no qualified hire in sight for upcoming large orders: a JAKA Zu 12 collaborative robot now supports the welder on table legs and metal grates.

JAKA Zu 12 collaborative robot welding metal furniture parts in a workshop
In shortA manufacturer of metal products, including furniture and construction components, welded table legs and metal grates in a single shift with one welder and one grinder. Large orders were coming, but no qualified welder could be hired. Robot Industries installed a JAKA Zu 12 collaborative robot on the existing welding power source. Welding time dropped, output grew and the work became safer.
12 kgpayload of the JAKA Zu 12 cobot
1,327 mmworking radius
1 weldernow supported by the cobot on large orders

The challenge

  • Production ran in a single shift with one welder and one worker for grinding.
  • Large orders were coming, and the company could not find a qualified welder despite extensive efforts.
  • Without extra capacity the company could not increase efficiency or scale production.
  • Intensive manual welding meant physical strain, fatigue and work-related risks.
Client
Manufacturer of metal products: construction components, furniture and accessories
Industry
Metalworking – home and garden furniture
Solution
JAKA Zu 12 collaborative welding robot
Scope
Welding of table legs and metal grates

The solution

  • A JAKA Zu 12 collaborative robot was installed in the welding area.
  • It has a 12 kg payload and a working radius of 1,327 mm.
  • The cobot works with the client's existing welding power source, so no new source was needed.
  • It assists the welder on high-volume orders of table legs and metal grates.
  • It takes over repetitive welding and reduces the physical load on the team.
JAKA Zu 12 collaborative robot welding metal furniture parts in a workshopJAKA Zu 12 collaborative robot welding metal furniture parts in a workshopJAKA Zu 12 collaborative robot welding metal furniture parts in a workshopJAKA Zu 12 collaborative robot welding metal furniture parts in a workshop

Before and after

BeforeWith the JAKA Zu 12 cobot
CapacityOne welder, one shiftWelder supported by a cobot
Large ordersLimited by hiring difficultiesHandled with existing staff
Welding timeFully manualReduced
Working conditionsStrain and fatigueSafer, less physical load
Your project

Do you have a similar challenge?

Tell us which parts you weld and what volumes you expect. A Robot Industries specialist will recommend the right cobot setup and send you an offer.

Write to us on WhatsApp

Get your offer in 3 steps

What would you like to automate?
When are you planning the project?
Where should we send your offer?

10 years of experience · Your data is never shared.

Frequently asked questions

Does the cobot need a new welding power source?

No. In this project the JAKA Zu 12 works with the welding power source the client already had.

Does the cobot replace the welder?

No. It supports the welder on large orders, reducing welding time, fatigue and physical strain.

What is included?

Delivery, installation and configuration on site, team training and technical support.

How do I find out the price?

The price depends on the configuration and on your application. Send us a request and we will send you an offer.

Similar case studies

All Robot Industries welding solutions →

To install this Web App in your iPhone/iPad press and then Add to Home Screen.